Support to Liberia International Airport (ROB)
Projet national au Libéria, financé par European Commission - Directorate-General for International Partnerships.
Objectif officiel
<p>Liberia¿s limited transport infrastructure and the legacy of conflict have constrained international connectivity and institutional capacities. In this context, air transport - centered on Roberts International Airport (RIA) - is essential for trade, mobility, and access to regional and global markets. RIA is the country¿s main international gateway and a key node for regional and intercontinental connectivity. At present, Brussels Airlines, part of the Lufthansa Group, is the only European carrier maintaining regular connections to Monrovia. Ensuring the continuity of this connection requires sustained compliance with international aviation safety and security standards.</p><p>However, RIA faces significant gaps in safety-critical infrastructure, equipment, and operational systems, limiting compliance with International Civil Aviation Organization (ICAO) standards and constraining emergency preparedness. These gaps also restrict the handling of certain cargo categories, including dangerous goods, thereby limiting trade potential.</p><p>The proposed action addresses these challenges through an integrated approach combining (i) provision of critical safety and emergency response equipment, (ii) rehabilitation and upgrading of safety-critical infrastructure, and (iii) strengthening of operational capacities and maintenance systems. This ensures that investments are not only delivered but also effectively operated and sustained.</p><p>An inception phase of up to six months will allow for detailed technical assessments, finalisation of specifications, and refinement of the scope and budget. Given that the available EU contribution of EUR 7.8 million is based on preliminary estimates for the civil works component, this phase is essential to define final budget requirements in a realistic and evidence-based manner for the civil works.</p><p>The action is aligned with the EU Global Gateway strategy and contributes to key Sustainable Development Goals, including SDG 9 (resilient infrastructure), SDG 3 (health and safety), and SDG 8 (economic growth). It supports ongoing EU and partner efforts and strengthens Liberia¿s institutional capacity, while contributing to safer, more reliable air connectivity and expanded trade opportunities.</p><p>The Multi-Donor Action ¿Enhancing Safe and Secure Air Connectivity at Roberts International Airport, Monrovia¿ is jointly co-financed by the European Union and the Federal Ministry of Economic Cooperation and Development (BMZ) and implemented by GIZ as part of the BMZ project ¿Integrated Corridors for Economic Growth in Africa (Support to PIDA)¿ (Africa InCORE). The total funding for the BMZ project Africa InCORE will be 16.8 million EUR, BMZ¿s share of the total funding is 9 Mio EUR.</p><p>The total budget of this Action is 8.6 million EUR (EU contribution 7.8 million EUR and BMZ contribution 800,000 EUR).</p><p class="ql-align-justify">The <strong>Overall Objective</strong> of the Action is to improve the safety,
Texte publié par le bailleur. Il décrit une intention au moment de l’approbation, pas un résultat obtenu.
Calendrier
- Début déclaré
- Clôture prévue
- Durée prévue
- 36 mois
10 % de la durée prévue est écoulée. C’est une mesure du temps, pas de l’avancement des travaux : celui-ci figure dans les rapports d’avancement officiels.
Financement
- Budget déclaré
- 7 800 000 EUR
Budget déclaré dans la devise du bailleur, sans conversion.
Place du numérique
40 % du projet relève des secteurs numériques, selon la ventilation déclarée par le bailleur. Le numérique en est une composante.
Le projet relève aussi de l’énergie (20 %) : il figure également dans l’observatoire des projets énergétiques.
- Technologies de l’information et de la communication (TIC) 40 %
- Code CAD 21020 40 %
- Production d’énergie, sources renouvelables, multiples technologies 20 %
Thèmes
- Connectivité et haut débit (Connectivité au Libéria) : « connectivity » figure dans l’objectif officiel.
Documents officiels
Aucun document publié dans les données ouvertes pour ce projet.
Projets proches
ITP 316 ICT-Reglering - Policy och Praktik, Spider & PTS
Angola, Burkina Faso, Burundi, Bénin et 23 autres
- Début
- 20 février 2017
- Bailleur
- Sweden
- Connectivité
West Africa Regional Communications Infrastructure Program
Sierra Leone, Libéria
- Engagement
- 56,6 millions de dollars
- Approuvé le
- 20 janvier 2011
- Bailleur
- Banque mondiale
- Connectivité
SOCODEVI - Stages internationaux 2009-2013
Côte d’Ivoire, Cameroun, Libéria, Mali et 2 autres
- Budget déclaré
- 750 000 CAD
- Début
- 26 mars 2010
- Bailleur
- Foreign Affairs, Trade and Development Canada (DFATD)
- Connectivité
Digital Capacity Building for Youth Workers in African Continent(25-27)(2026)
Libéria
- Budget déclaré
- 19 334 584 KRW
- Début
- 1er janvier 2026
- Bailleur
- Office for Government Policy Coordination