Aller au contenu principal
En cours European Commission - Directorate-General for International Partnerships

Support to Liberia International Airport (ROB)

Projet national au Libéria, financé par European Commission - Directorate-General for International Partnerships.

Vérifier sur la fiche officielle du bailleur

Objectif officiel

<p>Liberia¿s limited transport infrastructure and the legacy of conflict have constrained international connectivity and institutional capacities. In this context, air transport - centered on Roberts International Airport (RIA) - is essential for trade, mobility, and access to regional and global markets. RIA is the country¿s main international gateway and a key node for regional and intercontinental connectivity. At present, Brussels Airlines, part of the Lufthansa Group, is the only European carrier maintaining regular connections to Monrovia. Ensuring the continuity of this connection requires sustained compliance with international aviation safety and security standards.</p><p>However, RIA faces significant gaps in safety-critical infrastructure, equipment, and operational systems, limiting compliance with International Civil Aviation Organization (ICAO) standards and constraining emergency preparedness. These gaps also restrict the handling of certain cargo categories, including dangerous goods, thereby limiting trade potential.</p><p>The proposed action addresses these challenges through an integrated approach combining (i) provision of critical safety and emergency response equipment, (ii) rehabilitation and upgrading of safety-critical infrastructure, and (iii) strengthening of operational capacities and maintenance systems. This ensures that investments are not only delivered but also effectively operated and sustained.</p><p>An inception phase of up to six months will allow for detailed technical assessments, finalisation of specifications, and refinement of the scope and budget. Given that the available EU contribution of EUR 7.8 million is based on preliminary estimates for the civil works component, this phase is essential to define final budget requirements in a realistic and evidence-based manner for the civil works.</p><p>The action is aligned with the EU Global Gateway strategy and contributes to key Sustainable Development Goals, including SDG 9 (resilient infrastructure), SDG 3 (health and safety), and SDG 8 (economic growth). It supports ongoing EU and partner efforts and strengthens Liberia¿s institutional capacity, while contributing to safer, more reliable air connectivity and expanded trade opportunities.</p><p>The Multi-Donor Action ¿Enhancing Safe and Secure Air Connectivity at Roberts International Airport, Monrovia¿ is jointly co-financed by the European Union and the Federal Ministry of Economic Cooperation and Development (BMZ) and implemented by GIZ as part of the BMZ project ¿Integrated Corridors for Economic Growth in Africa (Support to PIDA)¿ (Africa InCORE). The total funding for the BMZ project Africa InCORE will be 16.8 million EUR, BMZ¿s share of the total funding is 9 Mio EUR.</p><p>The total budget of this Action is 8.6 million EUR (EU contribution 7.8 million EUR and BMZ contribution 800,000 EUR).</p><p class="ql-align-justify">The <strong>Overall Objective</strong> of the Action is to improve the safety,

Texte publié par le bailleur. Il décrit une intention au moment de l’approbation, pas un résultat obtenu.

Calendrier

Début déclaré
Clôture prévue
Durée prévue
36 mois

10 % de la durée prévue est écoulée. C’est une mesure du temps, pas de l’avancement des travaux : celui-ci figure dans les rapports d’avancement officiels.

Financement

Budget déclaré
7 800 000 EUR

Budget déclaré dans la devise du bailleur, sans conversion.

Place du numérique

40 % du projet relève des secteurs numériques, selon la ventilation déclarée par le bailleur. Le numérique en est une composante.

Le projet relève aussi de l’énergie (20 %) : il figure également dans l’observatoire des projets énergétiques.

  • Technologies de l’information et de la communication (TIC) 40 %
  • Code CAD 21020 40 %
  • Production d’énergie, sources renouvelables, multiples technologies 20 %

Thèmes

Documents officiels

Aucun document publié dans les données ouvertes pour ce projet.

Projets proches

Clôturé Régional Composante numérique 5 %

SOCODEVI - Stages internationaux 2009-2013

Côte d’Ivoire, Cameroun, Libéria, Mali et 2 autres

Budget déclaré
750 000 CAD
Début
26 mars 2010
Bailleur
Foreign Affairs, Trade and Development Canada (DFATD)
  • Connectivité

BNTIC News n’est pas le producteur de ces données. Les projets proviennent des fiches officielles publiées par les bailleurs : l’API publique des projets de la Banque mondiale (licence CC BY 4.0) et le Datastore IATI (licence propre à chaque éditeur). Chaque fiche renvoie vers sa source. Rien n’est enregistré en base : les données sont relues aux sources plusieurs fois par jour. Dernière collecte : 28/09/2026 à 05:30. Méthode, sources et limites.