Abandonné Projet régional Banque mondiale

Regional Transmission Development APL (RI)

Intitulé officiel, publié en anglais par le bailleur. Il n’est pas traduit ici pour rester identique à la source.

Projet régional couvrant 1 pays : Mozambique, financé par la Banque mondiale pour un engagement de 150 millions de dollars.

Vérifier sur la fiche officielle du bailleur

Objectif officiel

The Government of Mozambique is in the process of selecting strategic investors / project sponsors for several large power generation projects including the Moatize Coal-fired Generation Project, the Mphanda Nkuwa Hydropower Generation Project and the Temane Gas-fired Power Generation Project. Other major generation developments are envisioned in the future including developing the North Bank of the existing Cahora Bassa dam. It is anticipated that the first of these generation projects, Temane, would begin commercial operation as early as 2012, followed by Moatize and Mphanda Nkuwa within the next five years. The combined new generation capacity could exceed 4,000MW. The Government intends to ensure that the energy needed to develop Mozambique industry and to meet domesticdemand is available within Mozambique, as part of the development of this power generation potential. It is also anticipated that some of the electricity produced will be exported to SAPP countries. In order to realize this generation potential, significant investment is required in new transmission infrastructure. A pre-feasibility, options study was completed in 2005 to assess the costand preliminary design features of a Mozambique Transmission Backbone project which would connect the generation centers in Tete Province with teh trasnmission network in the south, a distance of 1,300km, as well as serve as a route for electricity export to the Southern African Power Pool via the South African network. The findings from the study indicate that the total investment required would be up to $1 billion, although the overall project could be implemented in stages. The Government recognizes that in order to finance this significant undertaking it is likely that both public and private sources of financing may be needed. A key objective for the Government is to keep the overall cost as low as possible, which would mean accessing concessional financing to the full extent possible. The Mozambique Transmission Backbone Project will support the development of the transmission backbone linking Tete Province with the south of Mozambique. World Bank participation in the project will be critical in terms of structuring and anchoring a bankable project, and will serve as a catalyst for raising the required financing. Remark: This is a multi-phase APL program which would involve up to 10 countries of the SAPP. This first APL involves Mozambique. The Government of Mozambique is in the process of selecting strategic investors / project sponsors for several large power and to meet domestic demand is available within Mozambique, as part of the development of this power generation potential. It is also anticipated that some of the electricity produced will be exported to SAPP countries. In order to realize this generation potential, significant investment is required in new transmission infrastructure. A pre-feasibility, options study was completed in 2005 to assess the cost and preliminary design f

Texte publié par le bailleur, en anglais. Il décrit une intention au moment de l’approbation, pas un résultat obtenu.

Calendrier

Financement

Engagement actuel
150 000 000 dollars
Dont Association internationale de développement (IDA)
150 000 000 dollars
Coût total déclaré du projet
500 000 000 dollars
Instrument
Prêt-programme évolutif

Montants en dollars des États-Unis, tels que publiés par la Banque mondiale. L’engagement actuel inclut les financements additionnels et les annulations. Ce sont des montants engagés, pas décaissés. Le montant couvre tous les pays participants ; il n’est pas réparti par pays.

Place de l’énergie

70 % du projet relève des secteurs de l’énergie, selon la ventilation déclarée par le bailleur. L’énergie en est l’objet principal.

  • Autres activités d’énergie et d’industries extractives 70 %
  • Trade 30 %

Thèmes

Documents officiels

Projets proches

En cours Énergie 100 %

Green Energy for Mozambique

Mozambique

Début
19 juillet 2024
Bailleur
European Commission - Directorate-General for International Partnerships
  • Électrification
  • Solaire
  • Hydroélectricité
  • Réseaux
  • Éolien et géothermie
  • Gaz et pétrole
  • Gouvernance

BNTIC News n’est pas le producteur de ces données. Les projets proviennent des fiches officielles publiées par les bailleurs : l’API publique des projets de la Banque mondiale (licence CC BY 4.0) et le Datastore IATI (licence propre à chaque éditeur). Chaque fiche renvoie vers sa source. Rien n’est enregistré en base : les données sont relues aux sources plusieurs fois par jour. Dernière collecte : 26/09/2026 à 23:42. Méthode, sources et limites.