Peter Brask, Chris Olson, Michael D. Gossett
The City of Boulder, Colorado, is installing a new 2.5-mi sanitary sewer transmission main to convey the majority of the city’s wastewater flows to the Boulder Water Resource Recovery Facility. The final mile of the 42-in. and 54-in. diameter interceptor runs through …
us
(code pays fourni par la source)
2023
conference-paper
OpenAlex
Peter Brask, Chris Olson, Michael D. Gossett
The City of Boulder, Colorado, is in need of a new 2.5-mi sewer transmission main to convey the majority of the city’s wastewater flows to the Boulder Water Resource Recovery Facility. On the upstream end of this project, a 2,000-ft section of …
us
(code pays fourni par la source)
2021
conference-paper
OpenAlex
Jon Wicke, Michael D. Gossett, Steve Pool, Keith Lemaster
Denver’s Metro Wastewater Reclamation District (Metro District or District) initiated the second creek interceptor (SD interceptor) project to provide a regional gravity solution to wastewater conveyance in the northeastern portion of the District’s service area. The project includes the design and construction …
us
(code pays fourni par la source)
2021
conference-paper
OpenAlex
Keith R. Bushdiecker, Jon S. Fischer, Michael D. Gossett
Denver Water’s northern supply system makes up a large portion of its water portfolio. The Moffat Collection System, constructed in the 1930s, is the beginning of this system. It includes a series of canals, tunnels, and pipelines to collect snowmelt runoff from …
us
(code pays fourni par la source)
2020
conference-paper
OpenAlex
Keith R. Bushdiecker, Jon S. Fischer, Michael D. Gossett
Over the past several years, Denver Water has been working to improve the reliability of its northern supply system which makes up large portion of its water portfolio. The Moffat collection system, originally constructed in the 1930s, is the beginning of this …
us
(code pays fourni par la source)
2019
conference-paper
OpenAlex
Michael D. Gossett, Alexis Woodrow, Katie Angell
Denver Water is replacing an existing large diameter pipeline along an 8.5-mile route between a reservoir and a water treatment plant. Property easements for this pipeline were acquired initially more than 80 years ago and, since that time, the land within and …
2018
conference-paper
OpenAlex
Keith R. Bushdiecker, Jeremy M. Ross, Michael D. Gossett
To make way for the redevelopment of Denver Water’s 35 acre Operations Complex, a 54-inch reinforced concrete cylinder pipe (RCCP) water transmission conduit required relocation, including the addition of an isolation valve and two new 90-degree bends to realign around planned buildings. …
2012
conference-paper
OpenAlex
Michael D. Gossett, Graham E. C. Bell, Steven R. Fox, Keith R. Bushdiecker et autres
Established as a Union Pacific railroad tent town in 1867, Cheyenne, named for a local Indian tribe, is now a progressive city that celebrates both its pioneer heritage and tomorrow's technology. As a railroad and cattle center, Wyoming's capital and largest city …