Aller au contenu principal
En cours Millennium Challenge Corporation

Utility Strengthening Activity

Intitulé officiel, publié en anglais par le bailleur. Il n’est pas traduit ici pour rester identique à la source.

Projet national au Sénégal, financé par Millennium Challenge Corporation.

Vérifier sur la fiche officielle du bailleur

Objectif officiel

Senegal Power Compact - Regulatory Strengthening and Capacity Building Project - Utility Strengthening Activity: This Activity aims to improve Senelec's commercial, financial, operational, and environmental performance. This includes: (A) Technical assistance to improve internal audit and control, procurement, financial management, and information services, including establishing, monitoring, and measuring technical, commercial, accounting, and financial management indicators, establishing business objectives, and overall performance monitoring and evaluation; (B) Establishing a utility performance incentive program, which is anticipated to include conditional disbursements to Senelec in the form of grants (funded by the Government Contribution) if Senelec is able to satisfy identified key performance indicators ("KPIs") (such as technical loss reductions, new connections, etc.). The incentive program shall be governed by an operations manual and related guidelines or agreements, each subject to MCC approval, setting forth the specific terms and conditions of the program, including but not limited to the identified KPIs and targets, the value of the conditional grants, permissible uses for the grants, and the role of Senegalese Regulatory Commission of Electricity Sector (CRSE) or other sector institutions in the program; (C) Technical assistance to improve the management of Senelec's transmission and distribution network, including to (1) improve safety management, (2) train and orient new and/or young staff, (3) strengthen asset management capabilities, including the provision of, and training with, key equipment and materials, (4) centralize and upgrade the geospatial information system database, including technical assistance to utilize and manage the new system; and (D) Technical assistance to Senelec, as well as other relevant electricity sector stakeholders, to adopt and implement best practices for environment and social performance, including (1) preparation of key plans and documentation for assessing, monitoring, and evaluating electricity projects, such as environmental and social management systems (each an "ESMS"), resettlement policy frameworks (each a, "RPF"), and RAPs, (2) integration of improved health, safety, and environmental policies and practices, (3) managing and mitigating the impact of resettlement in project zones, and (3) provision of, and training with, key environment compliance monitoring equipment and tools.

Texte publié par le bailleur. Il décrit une intention au moment de l’approbation, pas un résultat obtenu.

Calendrier

Début déclaré
Clôture prévue
Durée prévue
60 mois

100 % de la durée prévue est écoulée. C’est une mesure du temps, pas de l’avancement des travaux : celui-ci figure dans les rapports d’avancement officiels.

Financement

Budget déclaré
12 587 445 USD

Budget déclaré dans la devise du bailleur, sans conversion.

Place de l’énergie

100 % du projet relève des secteurs de l’énergie, selon la ventilation déclarée par le bailleur. L’énergie en est l’objet principal.

  • Politique énergétique et gestion administrative 100 %

Thèmes

Documents officiels

Aucun document publié dans les données ouvertes pour ce projet.

Projets proches

En cours Énergie 100 %

Governance Activity

Sénégal

Budget déclaré
8 579 905 USD
Début
9 septembre 2021
Bailleur
Millennium Challenge Corporation
  • Électrification
  • Réseaux
  • Efficacité
  • Gouvernance

BNTIC News n’est pas le producteur de ces données. Les projets proviennent des fiches officielles publiées par les bailleurs : l’API publique des projets de la Banque mondiale (licence CC BY 4.0) et le Datastore IATI (licence propre à chaque éditeur). Chaque fiche renvoie vers sa source. Rien n’est enregistré en base : les données sont relues aux sources plusieurs fois par jour. Dernière collecte : 28/09/2026 à 11:30. Méthode, sources et limites.