Reference is made to the request from the Ministry of Finance, Tanzania, in December 2014 requesting Sweden for a financial contribution of 600 000 000 SEK from Sweden and £ 30 000 000 from the United Kingdom to the government agency Rural Energy Agency (REA) for the 2015-2019 period with the purpose of scaling up modern rural energy access. The development objective of the intervention is poverty alleviation in rural mainland Tanzania through the providing of access to modern energy services based on renewable resources. Lack of access to electricity has been shown and is widely accepted as one of the main constraints to growth.REA was established in 2007 under the Rural Energy Act to promote and facilitate access to modern energy services in rural areas of mainland Tanzania by providing grants, subsidies and capacity building to developers of rural energy projects. The ambition in Tanzania is to increase energy access in the rural areas from 21% in 2014 to 50% per cent by 2020. In this regard REF is key to reach those results.The overall objective of the proposed programme is to contribute to the Tanzanian Government’s aim to reach the UN initiative Sustainable Energy for All (SE4ALL) ambition of universal energy access by 2030. Support to energy use that will lead to increased economic activity will be stimluated, with specific focus on female business owners. The Programme will also have incentives for connecting the poorer household segments, where female headed households are constituting a large share.The Programme funds will be divided into two REF financing windows: The on-grid electrification window includes two predefined village electrification schemes as well as two Result Based Finance (RBF) pilots which will be tested for so called densification of connections. It also includes a sum that will be used for distribution extensions based on RBF but defined more specifically at a later stage through the annual planning process. Parts of the financing in this on-grid window will be used for technical assistance and community mobilization.The off-grid, private sector renewable energy window aims at attracting and leveraging private sector finance by applying various financial instruments with the threefold purpose of;• Increasing access to renewable energy services in rural areas not yet reached by the national grid;• Achieve a market expansion for rural renewable energy provision;• Reaching the poorest household segment (‘Bottom of the Pyramid’) in already electrified areasDue to the required in-depth knowledge of selecting and applying suitable financial instruments, REA will outsource the financial management of both the on-grid as well as the off-grid component to a Trust Agent. The Trust Agent is the commercial bank Cooperative Rural Development Bank, CRDB, and has been selected through a procurement process. The Programme will be closely coordinated and aligned with support from other development partners supporting rural renewable
Texte publié par le bailleur. Il décrit une intention au moment de l’approbation, pas un résultat obtenu.
Calendrier
- Début déclaré
- Clôture prévue
- Durée prévue
- 139 mois
93 % de la durée prévue est écoulée. C’est une mesure du temps, pas de l’avancement des travaux : celui-ci figure dans les rapports d’avancement officiels.
Financement
Budget déclaré dans la devise du bailleur, sans conversion.
Place de l’énergie
100 % du projet relève des secteurs de l’énergie, selon la ventilation déclarée par le bailleur. L’énergie en est l’objet principal.
- Transport et distribution d’électricité (réseaux centralisés) 100 %
Thèmes
- Accès à l’électricité et électrification (Électrification en Tanzanie) : « access to electricity » figure dans l’objectif officiel.
- Réseaux électriques et interconnexions (Réseaux en Tanzanie) : « national grid » figure dans l’objectif officiel.
Documents officiels
Aucun document publié dans les données ouvertes pour ce projet.
Projets proches
Programme d'accès à l'électricité en Tanzanie
Tanzanie
- Budget déclaré
- 100 000 000 EUR
- Début
- 18 mai 2022
- Bailleur
- AFD
- Électrification
- Réseaux
Programme d'accès à l'électricité en Tanzanie
Tanzanie
- Budget déclaré
- 100 000 000 EUR
- Début
- 18 mai 2022
- Bailleur
- AFD
- Électrification
- Réseaux
Tanzanie - Projet hydroélectrique de Malagarasi
Tanzanie
- Budget déclaré
- 102 968 909 XDR
- Début
- 26 mai 2021
- Bailleur
- African Development Bank
- Électrification
- Hydroélectricité
- Réseaux
Rural Electrification Programme - Support to Turnkey III in Tanzania
Tanzanie
- Début
- 17 novembre 2017
- Bailleur
- European Commission - Directorate-General for International Partnerships
- Électrification
- Réseaux