Aller au contenu principal
Clôturé Sweden

Landsbygdselektrifiering i Vilanculos fas 2

Intitulé officiel, publié dans sa langue d’origine par le bailleur. Il n’est pas traduit ici pour rester identique à la source.

Projet national au Mozambique, financé par Sweden.

Vérifier sur la fiche officielle du bailleur

Objectif officiel

This decision concerns a proposed intervention "Rural Electrification in Vilanculos, Phase 2", which builds on an inception phase (Phase 1), funded by Sweden and implemented by the state owned utility Electricidade de Moçambique (EDM) in 2016-2018, after a recommendation by the Quality Committee AQAC at the Department of Africa, Sida (December 2014), to divide the proposed intervention in two parts and a request to the partner to add further information and analysis to the proposal. Through connection of the mini-grid in Vilanculos to the national transmission network; connection of new clients; and expand and upgrade of the existing distribution network, the following results are expected;1. Vilanculos is interconnect to the national grid, with adequate and reliable supply of sustainably produced electricity, and systems for transmission, transformation and distribution at district level - managed effectively by the utility EDM.2. Mitigation measures equivalent to reduction of more than 23,000 tCO2/year through substitution of fossil fuels with renewables, during 2021-2027.3. Inclusive, effective, and sufficient electricity services for public goods and households, including also vulnerable groups such as female-headed-households.4. Increased technical and financial viability of EDM, due to reduced system losses, and increased revenues from productive uses of electricity in the project area.The target group is the population in northern Inhambane and southern Sofala province, which is mainly rural with villages/smaller communities located along the main highways, where also the major part of the planned transmission line will go. 54% of the population consists of women, mainly depending on small-scale agriculture and fisheries as well as trade. The industrial sector is confined to a petrochemical industry and natural gas extraction. Today, 19% of residents in the province have access to electricity (2016), which is lower than the average for the country (26%). The planned intervention will target all households (both cement and mud houses), businesses, and institutions such as schools and health centres. In addition, close to 1,400 street lights will be installed. The clients will be offered different solutions such as ready boards which is a simpler solution. In total, it is estimated that approximately 95,000 inhabitants will have access to reliable electricity by project-end. By 2030, it is estimated that the number has been doubled.The proposed intervention will be implemented in 2018-2022, with main activities in 2019-2020. The GoM has for this requested Sida through the Embassy of Sweden in Maputo to support with a total of SEK 329 million. This relates to; costs for construction (transmission: 132 MSEK; substations: 115 MSEK; distribution including connection of new customers: SEK 64 million); costs for the Clients Representative (Hifab) of 14 MSEK; and costs for LED-lights and contingency assessed to 4 MSEK. Sida also estimates that a to

Texte publié par le bailleur. Il décrit une intention au moment de l’approbation, pas un résultat obtenu.

Calendrier

Début déclaré
Clôture
Durée prévue
85 mois

Financement

Budget déclaré dans la devise du bailleur, sans conversion.

Place de l’énergie

100 % du projet relève des secteurs de l’énergie, selon la ventilation déclarée par le bailleur. L’énergie en est l’objet principal.

  • Transport et distribution d’électricité (réseaux centralisés) 100 %

Thèmes

Documents officiels

Aucun document publié dans les données ouvertes pour ce projet.

Projets proches

En cours Énergie 100 %

Green Energy for Mozambique

Mozambique

Début
19 juillet 2024
Bailleur
European Commission - Directorate-General for International Partnerships
  • Électrification
  • Solaire
  • Hydroélectricité
  • Réseaux
  • Éolien et géothermie
  • Gaz et pétrole
  • Gouvernance
En cours

Mozambique - Mozambique Energie pour TOUS (MEFA)

Mozambique

Budget déclaré
27 719 810 XDR
Début
24 novembre 2021
Bailleur
African Development Bank
  • Électrification
  • Solaire
  • Réseaux
  • Éolien et géothermie
  • Gaz et pétrole
  • Gouvernance
En cours Énergie 56 %

National Control Centre for Energy

Mozambique

Début
6 décembre 2022
Bailleur
European Commission - Directorate-General for International Partnerships
  • Électrification
  • Solaire
  • Réseaux
  • Éolien et géothermie
  • Gouvernance
En cours Énergie 95 %

Mozambique Energi för Alla (NCC)

Mozambique

Début
1er novembre 2021
Bailleur
Sweden
  • Électrification
  • Solaire
  • Réseaux
  • Éolien et géothermie
  • Gouvernance

BNTIC News n’est pas le producteur de ces données. Les projets proviennent des fiches officielles publiées par les bailleurs : l’API publique des projets de la Banque mondiale (licence CC BY 4.0) et le Datastore IATI (licence propre à chaque éditeur). Chaque fiche renvoie vers sa source. Rien n’est enregistré en base : les données sont relues aux sources plusieurs fois par jour. Dernière collecte : 28/09/2026 à 05:30. Méthode, sources et limites.