Aller au contenu principal
En préparation African Development Bank

Éthiopie – Programme DREAM pour le déploiement des énergies renouvelables décentralisées au service de l’agriculture

Projet national en Éthiopie, en préparation avec African Development Bank.

Vérifier sur la fiche officielle du bailleur

Objectif officiel

The Lelicho and Murche Mini-Grid Sub-Projects form part of Ethiopia’s Distributed Renewable Energy and Agriculture Modalities (DREAM) Programme, an innovative energy-agriculture initiative designed to demonstrate a commercially viable, private sector-led model for rural electrification through renewable-energy mini-grids anchored by productive agricultural demand. The programme combines solar-hybrid mini-grids with irrigation infrastructure under an ABC model, comprising Anchor demand from irrigation, Business demand from micro, small and medium-sized enterprises, and Community connections for households. This demand-stacking approach is intended to improve project economics, strengthen revenue certainty and enhance the long-term sustainability of rural mini-grids. DREAM is jointly supported by the African Development Bank through the Sustainable Energy Fund for Africa (SEFA) and the Global Energy Alliance for People and Planet (GEAPP), in partnership with the Government of Ethiopia through the Ministry of Water and Energy, with the participation of the Ministry of Irrigation and Lowlands, the Ministry of Agriculture and the Agricultural Transformation Institute. The wider DREAM pilot covers nine mini-grid sites grouped into three geographic lots: Oromia, Amhara, and Sidama/Southern Ethiopia. RVE.SOL was selected to develop the Lelicho and Murche mini-grid sub-projects under Lot 3, which are the most advanced and implementation-ready sites under the programme. The two sub-projects will install approximately 1.4 MWp of renewable-energy generation capacity and 450 kWh of battery storage, generating an estimated 2.5 GWh of renewable electricity annually. The mini-grids will support household electricity access while also powering productive uses, particularly irrigation and rural businesses, thereby linking rural electrification with agricultural productivity and local economic development. The total estimated cost of the Lelicho and Murche sub-projects is approximately USD 3.8 million. Financing comprises a USD 2.0 million reimbursable grant from SEFA, representing approximately 50% of the project cost; a USD 1.51 million grant from GEAPP; and approximately USD 0.38 million in sponsor equity from RVE.SOL. At programme level, the DREAM pilot is estimated to cost approximately USD 20.6 million, including an overall USD 8 million SEFA financing envelope. The recipient and project company is RVE.SOL ETH Energy Generation Solutions PLC, an Ethiopian company established to develop, own and operate the Lelicho and Murche mini-grid assets. It is a subsidiary of RVE.SOL S.A. of Portugal. RVE.SOL ETH will be responsible for the construction, ownership and operation of the facilities under a concession granted by the Government of Ethiopia. The African Development Bank, acting as administrator of SEFA, will provide the USD 2 million reimbursable grant and implementation oversight.

Texte publié par le bailleur. Il décrit une intention au moment de l’approbation, pas un résultat obtenu.

Calendrier

Début déclaré

Financement

Budget déclaré
1 463 047 XDR

Budget déclaré dans la devise du bailleur, sans conversion.

Place de l’énergie

La source ne publie pas la ventilation sectorielle de ce projet.

  • Énergie solaire pour réseaux centralisés 0 %

Thèmes

Documents officiels

Aucun document publié dans les données ouvertes pour ce projet.

Projets proches

En cours Régional Énergie 100 %

Climate and Energy Response Facility (CERF)

République démocratique du Congo, Côte d’Ivoire, Algérie, Égypte et 9 autres

Budget déclaré
13 676 000 EUR
Début
1er janvier 2022
Bailleur
Netherlands Enterprise Agency
  • Solaire
  • Éolien et géothermie

BNTIC News n’est pas le producteur de ces données. Les projets proviennent des fiches officielles publiées par les bailleurs : l’API publique des projets de la Banque mondiale (licence CC BY 4.0) et le Datastore IATI (licence propre à chaque éditeur). Chaque fiche renvoie vers sa source. Rien n’est enregistré en base : les données sont relues aux sources plusieurs fois par jour. Dernière collecte : 30/09/2026 à 17:31. Méthode, sources et limites.