New ARC Power Supply for the TCV Diagnostic Neutral Beam Injector
Rattachement africain : ch. Niveau de preuve : code pays fourni par la source.
Le résumé fourni par la source
A Diagnostic Neutral Beam Injector (DNBI) is operated on the TCV Tokamak since 2000. Over the years, the plasma source and the ion optical system have benefited from several upgrades, whereas the power supply system remained almost unchanged. DNBI operation is now compromised by the obsolescence of both the power components and the control infrastructure. To allow for a long-term reliable operation, a complete renew of the power supplies set is ongoing. It includes a high-speed current source rated$500 \mathrm{A} / 100 \mathrm{V} / 2 \mathrm{s}$for the arc-discharge plasma source and a High Voltage Modulator (HVM) rated at$55 \text{kV} / 5 \mathrm{A} / 2 \mathrm{s}$(subject of a separate paper at this conference)
Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.
Le contrôle bibliographique ouvert
DOI retrouvé dans Crossref DOI retrouvé ; titre concordant.
- Titre Crossref
- New ARC Power Supply for the TCV Diagnostic Neutral Beam Injector
- Date Crossref
- 15/06/2025
- Éditeur
- IEEE
- Type
- proceedings-article
Ce recoupement confirme des métadonnées liées au DOI. Il ne confirme ni la méthode ni les conclusions de l’étude, et il ne compte pas comme une seconde source scientifique indépendante.
Les institutions déclarées
Une affiliation ne permet pas de déduire la nationalité d’un auteur.