Modeling the strategies and criteria for construction readiness in BIM-based projects

0Citations signalées, ce qui n’est pas une note de qualité
4Institutions déclarées
4Pays d’affiliation déclarés

Rattachement africain : cn, jp, my, bd. Niveau de preuve : code pays fourni par la source.

Le résumé fourni par la source

Purpose Building information modeling (BIM)-based projects that are not ready for construction can lead to project delays and cost overruns. However, projects often start without adequate readiness, despite the negative impacts of starting too early. Developing proper strategies to achieve the criteria for construction readiness in BIM-based projects is essential to ensure successful project execution. Therefore, this study aims to model the relationship between critical strategies and critical criteria for construction readiness in BIM-based projects. To achieve this aim, the study objectives are to identify critical strategies and critical criteria for construction readiness, to group these critical strategies and critical criteria into underlying constructs and to determine the relationship between strategy constructs and criteria constructs. Design/methodology/approach A systematic literature review and semi-structured interviews were conducted. Then, a survey was developed and distributed to BIM professionals. Data from 118 valid responses were analyzed using the normalized mean analysis, exploratory factor analysis (EFA) and partial least squares-structural equation modeling (PLS-SEM). Findings The analyses identified 23 critical strategies and 20 critical criteria. Three underlying constructs grouped the critical strategies (i.e. model management, coordination and competency) and critical criteria (i.e. model verification, integration and documentation). Moreover, the following relationships are significant: “model management-documentation,” “coordination-model verification,” “coordination-integration,” “coordination-documentation” and “competency-integration.” Originality/value Understanding these interrelationships can help project managers and BIM professionals develop more effective approaches to ensure that BIM-based projects are ready for construction and executed efficiently.

Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.

Le contrôle bibliographique ouvert

DOI retrouvé dans Crossref DOI retrouvé ; titre concordant.

Titre Crossref
Modeling the strategies and criteria for construction readiness in BIM-based projects
Date Crossref
24/11/2025
Éditeur
Emerald
Type
journal-article

Ce recoupement confirme des métadonnées liées au DOI. Il ne confirme ni la méthode ni les conclusions de l’étude, et il ne compte pas comme une seconde source scientifique indépendante.

Les institutions déclarées

Une affiliation ne permet pas de déduire la nationalité d’un auteur.

Les sujets associés

BIM and Construction IntegrationConstruction Project Management and PerformanceAdvanced Statistical Modeling Techniques

BNTIC News n’est pas le producteur de ces données. Les publications sont interrogées à la demande dans Crossref, OpenAIRE, DOAJ, Europe PMC, HAL, DataCite, AfricArXiv, ROR et la Banque mondiale, sans clé d’accès. OpenAlex reste optionnel. Aucun service payant n’est nécessaire et aucune donnée externe n’est enregistrée en base. Consulter les sources et leurs limites.