Aller au contenu principal
Accès ouvert déclaré 2025 article

The new ITER baseline, research plan and open R&D issues

58Citations signalées, ce qui n’est pas une note de qualité
25Institutions déclarées
13Pays d’affiliation déclarés

Rattachement africain : fr, ru, cn, de, gb, in, jp, kr, us, es, se, be, it. Niveau de preuve : code pays fourni par la source.

Le résumé fourni par la source

Abstract A new baseline (NB) has been proposed by the ITER Project to ensure a robust achievement of the Projects’ goals, in view of past challenges including delays incurred due to the Covid-19 pandemic, technical challenges in completing first-of-a-kind components and in nuclear licensing. The NB includes modifications to the configuration of the ITER device and its ancillaries (e.g. change from beryllium to tungsten as first wall material, modification of the heating and current drive mix, etc.) as well as additional testing of components (e.g. toroidal field coils) or phased installation (start with inertially cooled first wall before later installation of the final actively water-cooled components) to minimise operational risks. In the NB, the ITER research plan (IRP) will be divided into three main phases: (a) start of research operation, with 40 MW of ECH and 10 MW of ICH, which will focus on the demonstration of 15 MA operation in L-mode, commissioning of all required systems, including disruption mitigation, and the demonstration of H-mode plasma operation in deuterium; (b) DT-1, with 60–67 MW of ECH, 33 MW of neutral beam injection (NBI) and 10–20 MW of ICH, which will demonstrate robust operation in high confinement H-mode plasmas in DT up to Q ⩾ 10 and for burn durations of 300–500 s within an accumulated neutron fluence of ∼1% of the ITER machine’s lifetime total, and; (c) DT-2, with up to 67 MW of ECH, up to 49.5 MW of NBI and up to 20 MW of ICH, with the ITER tokamak and ancillaries in their final configuration to demonstrate routine operation in DT plasmas at high Q and the Q ⩾ 5 long-pulse and steady-state scenarios to the final neutron fluence and to perform R&D on nuclear fusion reactor issues. The logic, physics basis, modelling and experimental evaluations carried out to support the NB and the associated IRP are described. These include the impact of the tungsten wall on plasma scenarios and associated risk mitigation measures, as well as the optimisation of the tokamak components and ancillaries to minimise Project risks. Open R&D issues related to these evaluations and mitigation measures are also described together with experimental, modelling and validation activities required to address them.

Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.

Le contrôle bibliographique ouvert

DOI retrouvé dans Crossref DOI retrouvé, mais le titre doit être comparé manuellement.

Titre Crossref
The new ITER baseline, research plan and open R&D issues
Date Crossref
05/06/2025
Éditeur
IOP Publishing
Type
journal-article

Ce recoupement confirme des métadonnées liées au DOI. Il ne confirme ni la méthode ni les conclusions de l’étude, et il ne compte pas comme une seconde source scientifique indépendante.

Les institutions déclarées

Une affiliation ne permet pas de déduire la nationalité d’un auteur.

Les sujets associés

Magnetic confinement fusion researchFusion materials and technologiesSuperconducting Materials and Applications

BNTIC News n’est pas le producteur de ces données. Les publications sont interrogées à la demande dans Crossref, OpenAIRE, DOAJ, Europe PMC, HAL, DataCite, AfricArXiv, ROR et la Banque mondiale, sans clé d’accès. OpenAlex reste optionnel. Aucun service payant n’est nécessaire et aucune donnée externe n’est enregistrée en base. Consulter les sources et leurs limites.