Reinstallation and performance of the Belle II Silicon Vertex Detector
Rattachement africain : at, jp. Niveau de preuve : code pays fourni par la source.
Le résumé fourni par la source
At the beginning of 2024, the data taking of the Belle II experiment resumed after the long-shutdown 1, required to install a new two-layer DEPFET detector (PXD) and upgrade accelerator components. The whole silicon tracker (VXD) was extracted, the two halves of the outer strip detector (SVD) were split for the PXD insertion and reconnected again. The new VXD was commissioned for the start of the new run. We will describe the challenges of this VXD upgrade and report on the operational experience and the SVD performance obtained with this first-year data. We then introduce the various improvements in the reconstruction procedure, that exploit the excellent SVD hit-time resolution to enhance beam-induced background rejection and reduce track fake-rate, crucial aspects for the higher luminosity regime.
Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.
Le contrôle bibliographique ouvert
DOI retrouvé dans Crossref DOI retrouvé ; titre concordant.
- Titre Crossref
- Reinstallation and performance of the Belle II Silicon Vertex Detector
- Date Crossref
- 17/12/2024
- Éditeur
- Sissa Medialab
- Type
- proceedings-article
Ce recoupement confirme des métadonnées liées au DOI. Il ne confirme ni la méthode ni les conclusions de l’étude, et il ne compte pas comme une seconde source scientifique indépendante.
Les institutions déclarées
Une affiliation ne permet pas de déduire la nationalité d’un auteur.