RIVERBANK PROTECTION STRUCTURE FAILURE FACTORS AND REMEDIAL APPROACH: A CASE STUDY IN KELANTAN MALAYSIA
Rattachement africain : my. Niveau de preuve : code pays fourni par la source.
Le résumé fourni par la source
Numerous structural mitigation measures have been implemented to ensure the sustainability of socio-environmental systems. Riverbank erosion can be avoided through the installation of reinforced walls, groynes, and sheer piles, among other measures. However, these structures sometimes fail to protect riverbanks from collapsing due to various factors, including environmental and anthropogenic influences. Therefore, this study aims to identify the factors contributing to the failure of riverbank protection structures and determine remedial approaches to enhance them. The study utilized a combination of site visits, document analysis, and interviews with riverbank protection structure engineers and contractors to gather the necessary information to achieve study objectives. The study found that geomorphology; hydraulics; and unstable sheet pile construction were the factors to the riverbank failure. Besides, study also recommend the suitable remedial approach in terms of design; construction and maintenance to build a stable riverbank protection structure (rock embankment). The findings of this study can contribute to the development of more effective and sustainable riverbank protection measures, which are essential to protect vulnerable communities and ecosystems from the impacts of environmental hazards. The study's results can guide policymakers, engineers, and other stakeholders involved in riverbank protection to better understand the factors that contribute to structure failure and how to mitigate these risks. It can also contribute to the advancement of knowledge in the field of riverbank protection, specifically in identifying the most effective mitigation strategies.
Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.
Le contrôle bibliographique ouvert
DOI retrouvé dans Crossref DOI retrouvé ; titre concordant.
- Titre Crossref
- RIVERBANK PROTECTION STRUCTURE FAILURE FACTORS AND REMEDIAL APPROACH: A CASE STUDY IN KELANTAN MALAYSIA
- Date Crossref
- 05/11/2023
- Éditeur
- Malaysian Institute of Planners
- Type
- journal-article
Ce recoupement confirme des métadonnées liées au DOI. Il ne confirme ni la méthode ni les conclusions de l’étude, et il ne compte pas comme une seconde source scientifique indépendante.
Les institutions déclarées
Une affiliation ne permet pas de déduire la nationalité d’un auteur.