Aller au contenu principal
Accès ouvert déclaré 2021 article

Optimization of Two-Cell Cavities for the W and H Working Points of the FCC-ee Considering Higher-Order Mode Effects

0Citations signalées, ce qui n’est pas une note de qualité
2Institutions déclarées
2Pays d’affiliation déclarés

Rattachement africain : de, ch. Niveau de preuve : code pays fourni par la source.

Le résumé fourni par la source

The lepton collider of the future circular collider (FCC-ee) aims at conducting precision measurements on the Z, W, and H bosons and the top quark. The present RF baseline considers single-cell cavities at 400 MHz for the high current Z-pole working point, four-cell 400 MHz cavities for the W and H working points, and a hybrid RF system composed of four-cell 400 MHz and five-cell 800 MHz cavities for the high energy tt working point. The W working point has shown limitations in the achievable HOM damping for beam stability requirements using four-cell cavities. A two-cell cavity is studied as an alternative scenario for the current W- and H-RF setups with a special focus on HOM damping during the optimization of the RF geometry.

Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.

Le contrôle bibliographique ouvert

La source scientifique ouverte est momentanément indisponible.

Les institutions déclarées

Une affiliation ne permet pas de déduire la nationalité d’un auteur.

Les sujets associés

Particle accelerators and beam dynamicsGyrotron and Vacuum Electronics ResearchHVDC Systems and Fault Protection

BNTIC News n’est pas le producteur de ces données. Les publications sont interrogées à la demande dans Crossref, OpenAIRE, DOAJ, Europe PMC, HAL, DataCite, AfricArXiv, ROR et la Banque mondiale, sans clé d’accès. OpenAlex reste optionnel. Aucun service payant n’est nécessaire et aucune donnée externe n’est enregistrée en base. Consulter les sources et leurs limites.