Status of the Injection System of the CLARA FEL Test Facility
Rattachement africain : gb, ru. Niveau de preuve : code pays fourni par la source.
Le résumé fourni par la source
The 250 MeV CLARA FEL test facility is now under construction at Daresbury Laboratory. Electron beam for this facility is provided by two normal conducting S-band photocathode guns: a 10 Hz 2.5 cell gun earlier used as the injector for the VELA machine, and a 400 Hz 1.5 cell gun now under commissioning. At the initial stage of Phase I CLARA will operate with the 10 Hz gun and a 45 MeV 2 m long linac section working as a buncher and/or booster. The beam will be deflected into the existing VELA beamline with an S-bend and directed to the spectrometer line for analysing beam properties or into one of two VELA user areas. The 400 Hz gun will be installed in the VELA beamline for detailed high power RF and beam commissioning in the VELA beam diagnostics suite. As the 400 Hz gun is equipped with an interchangeable photocathode it is possible to investigate different metal photocathodes and select the one providing minimal beam emittance at highest quantum efficiency. A state of the art photocathode preparation system is under commissioning at Daresbury. After commissioning the 400 Hz gun will be installed to the CLARA beam line to deliver high energy, high repetition rate beams for the FEL facility, and the 10 Hz gun will be returned to the VELA beam line.
Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.
Le contrôle bibliographique ouvert
Les institutions déclarées
Une affiliation ne permet pas de déduire la nationalité d’un auteur.