The Integration of the 241-Z Building Decontamination and Decommissioning Under CERCLA with RCRA Closure at the Plutonium Finishing Plant

0Citations signalées, ce qui n’est pas une note de qualité
0Institutions déclarées
0Pays d’affiliation déclarés

Le résumé fourni par la source

The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO) [Ref. 1], RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential pastpractice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks, [Ref. 2]. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA.

Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.

Le contrôle bibliographique ouvert

Aucun DOI disponible pour le contrôle Crossref.

Les sujets associés

Nuclear and radioactivity studiesGraphite, nuclear technology, radiation studiesRisk and Safety Analysis

BNTIC News n’est pas le producteur de ces données. Les publications sont interrogées à la demande dans Crossref, OpenAIRE, DOAJ, Europe PMC, HAL, DataCite, AfricArXiv, ROR et la Banque mondiale, sans clé d’accès. OpenAlex reste optionnel. Aucun service payant n’est nécessaire et aucune donnée externe n’est enregistrée en base. Consulter les sources et leurs limites.