Installation-Driven Field Developments for Deepwater Subsea Projects

5Citations signalées, ce qui n’est pas une note de qualité
0Institutions déclarées
0Pays d’affiliation déclarés

Le résumé fourni par la source

Abstract At the concept select stage and certainly at the FEED stage of deepwater subsea projects the focus is often exclusively on optimisation of functionality during operation. For deepwater and particularly in the current market climate, however, the ‘best’ field development may need to satisfy other drivers. The ‘best’ solution does require knowledge and definition of what is considered of most value to the project whilst managing CAPEX and lowering risk. Given that, for a Greenfield subsea development, approximately one third of the CAPEX is associated with the SURF (subsea umbilicals, risers and flowlines) package, and around one half of this cost is attributable to the offshore installation phase. Along with all the risk, there are strong commercial reasons alone for focusing on installability during all phases of the development cycle. Layering on top of this the shortage of capable vessels and their tight availability, the development scenario that provides a greater number of suitable vessels for offshore construction offers a more competitive bid phase, additional schedule benefits and lower risk as the subsea systems are that much more installable by design. This paper illustrates how an installation-driven (or installation-focused) development process provides the necessary operational functionality for deepwater subsea projects by leveraging recent experience on a variety of projects from around the world. 1.0 INTRODUCTION In a world of ever-increasing demand for hydrocarbons, the race is to tap the deepwater resources and get the production started as early as possible. For a deepwater subsea field development this leads to a fast-track approach and due attention is not given to all project drivers. At the concept select stage and certainly at the FEED stage of deepwater subsea projects the focus is often exclusively on optimisation of functionality during operation. For deepwater and particularly in the current market climate, however, the ‘best’ field development may need to satisfy other drivers. The ‘best’ solution does require knowledge and definition of what is considered of most value to the project whilst managing CAPEX and lowering risk.

Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.

Le contrôle bibliographique ouvert

DOI retrouvé dans Crossref DOI retrouvé ; titre concordant.

Titre Crossref
Installation-Driven Field Developments for Deepwater Subsea Projects
Date Crossref
05/05/2008
Éditeur
OTC
Type
proceedings-article

Ce recoupement confirme des métadonnées liées au DOI. Il ne confirme ni la méthode ni les conclusions de l’étude, et il ne compte pas comme une seconde source scientifique indépendante.

Les sujets associés

Marine and Offshore Engineering StudiesOffshore Engineering and TechnologiesReservoir Engineering and Simulation Methods

BNTIC News n’est pas le producteur de ces données. Les publications sont interrogées à la demande dans Crossref, OpenAIRE, DOAJ, Europe PMC, HAL, DataCite, AfricArXiv, ROR et la Banque mondiale, sans clé d’accès. OpenAlex reste optionnel. Aucun service payant n’est nécessaire et aucune donnée externe n’est enregistrée en base. Consulter les sources et leurs limites.