Large-Scale ATLAS Simulated Production on EGEE
Rattachement africain : es, ch, nl, de, it, us, ca. Niveau de preuve : code pays fourni par la source.
Le résumé fourni par la source
In preparation for first data at the LHC, a series of Data Challenges, of increasing scale and complexity, have been performed. Large quantities of simulated data have been produced on three different Grids, integrated into the ATLAS production system. During 2006, the emphasis moved towards providing stable continuous production, as is required in the immediate run-up to first data, and thereafter. Here, we discuss the experience of the production done on EGEE resources, using submission based on the gLite WMS, CondorG and a system using Condor Glide-ins. The overall walltime efficiency of around 90% is largely independent of the submission method, and the dominant source of wasted cpu comes from data handling issues. The efficiency of grid job submission is significantly worse than this, and the glide-in method benefits greatly from factorising this out.
Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.
Le contrôle bibliographique ouvert
DOI retrouvé dans Crossref DOI retrouvé ; titre concordant.
- Titre Crossref
- Large-Scale ATLAS Simulated Production on EGEE
- Date Crossref
- 01/12/2007
- Éditeur
- IEEE
- Type
- proceedings-article
Ce recoupement confirme des métadonnées liées au DOI. Il ne confirme ni la méthode ni les conclusions de l’étude, et il ne compte pas comme une seconde source scientifique indépendante.
Les institutions déclarées
Une affiliation ne permet pas de déduire la nationalité d’un auteur.