Aller au contenu principal
Accès ouvert déclaré 2011 article

From data storage towards decision making: LHC technical data integration and analysis

0Citations signalées, ce qui n’est pas une note de qualité
0Institutions déclarées
0Pays d’affiliation déclarés

Le résumé fourni par la source

The monitoring of the beam conditions, equipment conditions and measurements from the beam instrumentation devices in CERN’s Large Hadron Collider (LHC) produce more than 100 Gb/day of data. Such a big quantity of data is unprecedented in accelerator monitoring and new developments are needed to access, process, combine and analyse data from different equipments. The Beam Loss Monitoring (BLM) system has been one of the most reliable equipments in the LHC during its 2010 run, issuing beam dumps when the detected losses were above the defined abort thresholds. Furthermore, the BLM system was able to detect and study unexpected losses, requiring intensive offline analysis. This article describes the techniques developed to: access the data produced (' 50000 values/s); access relevant system layout information; access, combine and display different machine data.

Ce résumé expose les affirmations des auteurs. BNTIC ne l’interprète pas comme une validation indépendante des résultats.

Le contrôle bibliographique ouvert

Aucun DOI disponible pour le contrôle Crossref.

Les sujets associés

Particle Detector Development and PerformanceSuperconducting Materials and ApplicationsParticle Accelerators and Free-Electron Lasers

BNTIC News n’est pas le producteur de ces données. Les publications sont interrogées à la demande dans Crossref, OpenAIRE, DOAJ, Europe PMC, HAL, DataCite, AfricArXiv, ROR et la Banque mondiale, sans clé d’accès. OpenAlex reste optionnel. Aucun service payant n’est nécessaire et aucune donnée externe n’est enregistrée en base. Consulter les sources et leurs limites.